          玻璃鋼防腐管道安裝要求
          時間:2022-07-05  瀏覽:5247次

            Requirements for installation of FRP pipes

            1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

            1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

            2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

            2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

            3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

            3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

            4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

            4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

            5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

            5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

            6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

            6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

            7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

            7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


          主站蜘蛛池模板: 狼友福利在线观看| 人妻va精品va欧美va| 影音先锋女人av鲁色资源网小说| 欧美成人一区二区三区片免费| 亚洲中文无码线在线观看| 华人91视频| 人妻综合第一页| 日日碰狠狠添天天爽超碰97| 欧美精品无需播放器在线观看| 婷婷99精品国产97久久综合| 欧美a在线免费观看| 大桥未久亚洲无av码在线| 中文字幕久一区二区| 精品久久欧美熟妇www| 亚洲最大成人网站| 亚洲中文无码永久免| 奇骏影院在线观看免费版| 亚洲成人精品免费| 右手影院亚洲欧美| 亚洲国产成人超a在线播放| 99久久国产宗和精品1上映| 91色鬼| 国产在线无码不卡播放| 野花社区日本免费图片| 亚州成人AⅤ| 久久av高潮av| 日韩无码第2页| 国产在线尤物在线不卡网站| 伊人精品成人久久综合| 国产精品自线在线播放| 黑人巨茎大战欧美白妇免费| 爽爽影院免费观看视频| 欧美亚洲国产一区二区三区| 在线观看网址你懂的| 亚州精品成人| 亚洲黑人av| a4yy私人毛片| jizz18| 无码人妻久久久一区二区三区| 国产91?在线播放九色竹菊影视| 99久久国语露脸精品国产|